First Website: dratingfoundation.com
Sven, Lena, and I tried hard to spend time on the project while we were busy with our main jobs. I drafted the concept, sent it to some friends, received their feedback, and revised the draft. In total, I made 10 major revisions and it took me about six months to finalize it.
Sven and Lena, with big help from a friend of theirs, transformed the final concept into our website. It was a difficult task because they did not have expertise and experience in designing website. It took about six months also to finish the website. And, at the end of 2011 the website was activated: www.dratingfoundation.com (the website’s name was from my dear friends Sven and Lena).